Construction Survey in the UAE

Construction Survey

A small error in setting out can cost weeks on site. We work alongside your site team from the first grid line to the final as-built, so foundations, columns and finished levels end up where the drawings put them.

  • Setting out from approved drawings
  • Regular level and position checks
  • Survey crews supplied for long projects
WhatsApp an Engineer

Request a Quote

Your request also opens in WhatsApp so our team can reply faster.

What we offer

Construction survey services

Setting out

Setting out

We take the design coordinates and mark them on the ground: grid lines, piles, footings, columns, walls and road alignments. Each point is checked from a second position before we hand it over, so your team can build with confidence.

  • Grids, piles, columns and alignments
  • Every point checked twice
  • Marked clearly for the site crew
Get a Quote
When you need it

Who we work with on site

Main contractors

Setting out and level control through the full build.

Subcontractors

Piling, MEP and infrastructure setting out.

Developers

Independent checks on what is being built.

Consultants

Survey data to verify work and approve payments.

How it works

How we work with your site team

  1. 1

    Review drawings

    We check the approved drawings and control points before going to site.

  2. 2

    Control setup

    Site control and benchmarks are set and verified.

  3. 3

    Setting out

    Points are marked and checked, then handed to your foreman.

  4. 4

    Ongoing checks

    Levels and positions are checked at agreed stages.

  5. 5

    As-built

    We record the finished work for completion and handover.

Project experience

Construction Survey in action

Arkan Contracting

Road Design and Cut and Fill Surveys for Arkan Contracting

Topographic surveys, road design support and cut and fill calculations for road projects.

Since 2019Ongoing
Read Case Study
FAQ

Common questions

Can you provide a surveyor on site full time?

Yes. For larger projects we can place a surveyor on site for the whole job or for set days each week, whichever fits your program.

How quickly can you come to site?

For ongoing projects we usually attend within a day or two of a request. If it is urgent, call us and we will do our best to come sooner.

What do you need from us before setting out?

The latest approved drawings, the plot coordinates and access to the site. If the design has changed, please share the revision so we set out from the right version.

Do you check work done by other surveyors?

Yes. Independent checks are a common request from developers and consultants who want a second opinion before signing off work.

Contact

Talk to our team

Call Get a Quote
Chat with us